Concrete Mix and Material Calculator

Estimate materials from concrete volume and an approximate mix ratio. Use the approved design mix for actual construction.

What are you pouring?

Units
Member

Roof slabs are usually 4.5 to 6 inches (115 to 150 mm).

1.54 is an estimating assumption, not a strength requirement.

Material settings

Use measured loose densities and the water ratio from your approved mix. These settings estimate quantities, not concrete strength.

kg/m³

kg/m³

kg/m³

Water litres per kg of cement, before any moisture correction. Not a mix-design recommendation.

Material prices (optional)

Example prices only. Enter your supplier quotes in the units shown; changing length units does not convert prices.

Results

Cement
30 bags
50 kg bags, rounded up. 1,498.53 kg of cement
Sand
55.12 cft
2.50 tonnes, 1.56 m³
Aggregate (20 mm)
110.25 cft
4.84 tonnes, 3.12 m³
Water
749.26 litres
25 litres per bag of cement
Concrete
131.25 cft
3.72 m³ including 5% wastage

Mix

Cement : sand : aggregate = 1 : 1.5 : 3

Estimated material cost

Cement, sand and aggregate
₹19,393

At the prices under "Material prices". Steel, labour and shuttering are not included.

Estimate only. Confirm quantities with your engineer or contractor. Read more

Working

  1. Wet volume: 3.54 m³ × 1.05 for wastage = 3.717 m³
  2. Dry volume: 3.717 × 1.54 = 5.724 m³
  3. Mix 1 : 1.5 : 3 has 5.5 parts
  4. Cement: 5.724 × 1 ÷ 5.5 = 1.041 m³ × 1,440 kg = 1,498.53 kg = 29.97 bags
  5. Sand: 5.724 × 1.5 ÷ 5.5 = 1.561 m³
  6. Aggregate: 5.724 × 3 ÷ 5.5 = 3.122 m³

How the quantities are worked out

  1. Wet volume of the member: length × width × thickness (or the column, beam or footing size), times the number of pieces.
  2. Add wastage, usually 5%.
  3. Multiply by the dry volume factor, 1.54, to allow for the voids that close up when water is added.
  4. Split the dry volume by the mix ratio. For the M20 reference ratio (1 : 1.5 : 3), cement is 1 part in 5.5.
  5. Cement: m³ × 1,440 kg ÷ 50 kg per bag, rounded up to whole bags. Sand weighs about 1,600 kg per m³ and aggregate about 1,550 kg.
  6. Water: 25 litres per bag, a water-cement ratio of 0.5.
Approximate ratios for quantity estimates
ReferenceCement : sand : aggregateScope
1 : 1 : 2 preset1 : 1 : 2Quantity estimate only; not an M25 design mix
M20 reference1 : 1.5 : 3M20 reference estimate; confirm the approved mix
M15 reference1 : 2 : 4Plain concrete, paths, kerbs
M10 reference1 : 3 : 6Levelling course under foundations
M7.5 reference1 : 4 : 8Lean concrete under footings

Worked example: 10 m³ of M20

  1. Dry volume: 10 × 1.54 = 15.4 m³. The mix has 1 + 1.5 + 3 = 5.5 parts.
  2. Cement: 15.4 ÷ 5.5 = 2.8 m³ × 1,440 kg = 4,032 kg, which is 80.6, so 81 bags (8.06 bags per m³).
  3. Sand: 15.4 × 1.5 ÷ 5.5 = 4.2 m³, about 148 cft or 6.7 tonnes.
  4. Aggregate: 15.4 × 3 ÷ 5.5 = 8.4 m³, about 297 cft or 13 tonnes.
  5. Water: 80.6 bags × 25 litres = about 2,016 litres.

Getting good concrete on site

IS 456 prefers design mixes. Nominal mixes are limited to M20 or lower and need the engineer-in-charge's permission when a design mix cannot be used. The 1 : 1 : 2 preset here estimates quantities only; it does not establish M25 strength. See the government audit discussion of IS 456, section 7.10.3.

Reviewed 6 November 2026. Dry volume factors, loose densities, water and prices are estimating assumptions; use the approved mix and measured site conditions.

  • Batch by volume carefully. Use a gauge box for sand and aggregate rather than counting head pans; small errors add up over a slab.
  • Do not add extra water to make pouring easier. Each extra litre lowers the strength. Use a plasticiser if the mix is too stiff.
  • Compact well. Use a needle vibrator so no air pockets are left around the steel.
  • Cure for at least 7 days (10 to 14 for PPC cement) by ponding or wet hessian.

Frequently asked questions

Why multiply by 1.54 for dry volume?
Dry cement, sand and aggregate have air gaps between the particles. When water is added and the concrete is compacted, the fine particles fill those gaps and the mix shrinks. About 1.54 m³ of dry material makes 1 m³ of compacted concrete, so the wet volume is multiplied by 1.54.
How many bags of cement are in 1 m³ of M20 concrete?
Using the approximate 1 : 1.5 : 3 reference ratio gives 5.5 parts. Dry volume is 1 × 1.54 = 1.54 m³, so cement is 1.54 ÷ 5.5 = 0.28 m³. At 1,440 kg per m³ that is 403 kg, or about 8 bags of 50 kg, before wastage.
How many bags of cement are in 100 cft (1 brass) of M20?
100 cubic feet is 2.83 m³. At about 8.06 bags per m³ that is close to 23 bags, or about 24 with 5% wastage.
Which grade should I use for a house roof slab?
Ask the structural engineer to specify the grade and approved design mix for the actual loads and exposure. A fixed volume ratio does not guarantee a grade. IS 456 prefers design mixes; nominal mixes are limited to M20 or lower with the engineer-in-charge's permission when a design mix cannot be used. The 1 : 1 : 2 preset here is only a quantity estimate.
How much water does a bag of cement need?
The estimate multiplies the unrounded cement mass in kg by the water-cement mass ratio. The starting ratio of 0.5 gives 25 litres per 50 kg of cement. You can edit it in Material settings. Use the approved mix and account for aggregate moisture; this estimate does not specify a suitable ratio for your structure.
Can I use M-sand instead of river sand?
The quantity estimate can use either, with a loose sand density you enter in Material settings. The starting density is 1,600 kg per m³; it is not a measured value for your supply. Grading, moisture and suitability for the approved mix need separate checks.
How long should concrete be cured?
IS 456:2000 asks for at least 7 days of keeping the concrete wet for ordinary Portland cement, and 10 to 14 days for blended cements such as PPC or mixes with fly ash. Ponding water on slabs or wrapping columns in wet hessian works well.
Can I use my own material settings and prices?
Yes. Open Material settings to enter your product or site values, and Material prices to enter supplier quotes. The starting prices are examples, not current local rates. Price and coverage units stay as labelled when you switch length units. Custom wastage accepts 0 to 50%. Shared links retain your settings; Reset restores the examples.